O'Chiese First Nation Powwow Arbor Replacement

O'Chiese First Nation proposes to construct a replacement Powwow Arbour. The original building structure was constructed around 2014 as a circular, open-air structure with an outer and inner roof. The upper roof was at one point damaged and the existing foundation system appears to be an inadequate design. The project includes the design and construction of a new structure and foundation that is approximately 2953 square metres.


Latest update

August 1, 2023 -  Indigenous Services Canada issued its notice of determination Notice of Determination for O'Chiese First Nation Powwow Arbor Replacement (iaac-aeic.gc.ca) and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination for O'Chiese First Nation Powwow Arbor Replacement - July 31, 2023
1 Notice of Intent to make a Determination - June 29, 2023

Contacts

Indigenous Services Canada
Gregory Bosse, Environment Officer
630 Canada Place 9700 Jasper Avenue
Edmonton, Alberta T5J 4G2
Email: gregory.bosse@sac-isc.gc.ca


  • Location

    • O'Chiese First Nation (Alberta)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Completed
  • Start Date

    2023-06-29
  • Proponent

    O'Chiese First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    85728